4/24 Weekly Work Log

Session Number 6
Week Number 9
Total Estimated Hours Contributed this Week: 5
What was your overall goal for this week? Continue working on pre-production and begin production process. 



Work Tasks 

Date Task Description Time Spent Was this a Best Practice? 
4/24Reviewing and fixing pre-production blog post.50 minutesI did not have enough information in my pre-production to prepare me for production.
4/25Adding film elements to summary section on blog post. 50 minutesThis was important in recognizing my intentions for the film (during post-production).
4/26Preparing for production – collaboration to create a detailed shot list50 minutesIt was vital we had everything prepared in order to use the whole class period to film on the 27th.
 4/27Production – filming. 50 minutesWe made sure we could finish filming in one class period so that we could move into post-production (allowing me to have enough time to edit during post-production).
 4/28Organizing clips and audio from filming yesterday, beginning editing. 50minutes
Spending time organizing clips was important in order to edit efficiently.

Leave a Reply

Your email address will not be published. Required fields are marked *

Skip to toolbar